The sealed bag can be moved, and will take 2-7 days to fully cure, pending temperature. For the curing, the parts can be brought back to campus and sit sealed up in the NER bay until fully cured.
Bodywork
Geometries
The nosecone consists of two primary panels and a top panel. The sidepod is one piece.
...
Materials
Fabric
2x2 twill 3k carbon fiber fabric
Resin https://www.fibreglast.com/product/System_2000_Epoxy_Resin_2000
System 2000 Laminating Epoxy Resin
2060 Hardener
Other/Equipment
Orange Tooling Gel Coat https://www.fibreglast.com/product/Orange_Tooling_Gel_Coat_just_gel_coats_188
Vacuum pump, tubing, fittings
Vacuum bags and tape
Paint rollers
Mylar film
Vacuum bagging breather/bleeder https://www.fibreglast.com/product/Breather_and_Bleeder_579/Vacuum_Bagging_Films_Peel_Ply_Tapes
High-Level Procedure
Molds [4 hrs, active]
All molds will be sealed with gelcoat. Setup and fabrication will take ~180 minutes. The gel curing will take ~45 minutes. Fabrication and curing will be in an appropriately ventilated area and the molds may be removed once fully cured.
Nosecone Primary Panels [4 hrs active, 1 week passive]
Both primary panels will be fabricated in one work session. The setup, fabrication, and vacuum bagging time is ~120min for each panel. The part must remain in an appropriated ventilated area while under vacuum for the specified curing time. Once cured, the sealed part may be removed and placed into the NER bay for ~1 week to fully cure.
Nosecone Top Panel [3 hrs active, 1 week passive]
The top panel will be fabricated in one work session. The setup, fabrication, and vacuum bagging time is ~180 minutes. The part must remain in an appropriated ventilated area while under vacuum for the specified curing time. Once cured, the sealed part may be removed and placed into the NER bay for ~1 week to fully cure.
Left Sidepod [3 hrs active, 1 week passive)
The left sidepod will be fabricated in one work session. The setup, fabrication, and vacuum bagging time is ~180 minutes. The part must remain in an appropriated ventilated area while under vacuum for the specified curing time. Once cured, the sealed part may be removed and placed into the NER bay for ~1 week to fully cure.
Right Sidepod
The right sidepod will be fabricated in one work session. The setup, fabrication, and vacuum bagging time is ~180 minutes. The part must remain in an appropriated ventilated area while under vacuum for the specified curing time. Once cured, the sealed part may be removed and placed into the NER bay for ~1 week to fully cure.