Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Put your stock on the bed of the machine lining the bottom left corner up with the machine’s bottom and secure it down. (For fusible links, use the small magnets to hold the aluminum down.

  2. Jog the nozzle using the arrow keys to put it where you want the path zero to be then click zero for the Path Start position.

...

  1. do dry runIMG_2382.jpegImage Added IMG_2383.jpegImage Added IMG_2384.jpegImage Added IMG_2386.jpegImage Added IMG_2379.jpegImage Added IMG_2380.jpegImage Added

  2. set z height

  3. connect tube to nozzle head

  4. flip lemon down

  5. close lid

  6. run

  7. rinse part and take it out