Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

All airfoils and endplates are separate parts that will be screwed together.

...

Front Plate Dimensions:

  • 23”x12”x0.25”

  • 20”x8”x0.25”

  • 4.75”x6”x0.25”

Front Airfoil Dimensions:

  • 15”x12.5”x2.5”

  • 15”x8.5”x1.5”

  • 8.4”x6.25”x1”

Rear Plate Dimensions: 24”x31”0.25”

Rear Airfoil Dimensions:

  • 14”x3.5”x40”

  • 8.5”x1.5”x40”

  • 6.25”x1.25”x40”

Materials

Fabric

  • 2x2 twill 3k carbon fiber fabric

...

The nosecone consists of two primary panels and a top panel. The sidepod is one piece.

...

Nosecone primary panels: 36”x22”x5”

Nosecone top panel: 50”x28”x22”

Sidepods: 36”x12.5”x11.15”

Materials

Fabric

  • 2x2 twill 3k carbon fiber fabric

...

The seat consists of a single carbon fiber body, the seat shell.

...

Seat (approximate) dimensions: 9”x18”x12”

Materials

Fabric

  • 2x2 twill 3k carbon fiber fabric

...

High-Level Procedure

Taking place early December 2023 or January 2024

Mold [2hr active]

The mold will be covered in gelcoat. The setup and fabrication time should take ~1 hour, and the gel coat will cure in ~45 minutes. Mold will be fabricated and stored in a ventilated area during curing and removed once curing completes.

...

The seat shell will be laid in one work session. From setup to bagging/cleanup, the process should take ~2 hours. After the seat shell is bagged, it must remain in the ventilated area with the vacuum pump on for 1 hour. After this, the sealed bag can be brought back to the NER bay and left for 2-7 days until fully cured.

Finishing [~3 hr active]

After removal from the mold, the seat shell will need to be finished. This will involve cutting off the ends with a dremel and smoothing the surface and edges by sanding. This should take a few hours and be done in a well-ventilated area with proper PPE, including N95 respirators, gloves, and coveralls.