Categories on the naming sheet:
Letter breakdowns for projects:
Master Assemblies -100
System Assemblies - 200
sub assemblies for systems eg. batt box, transmission, knuckle, etc
handling 200H
ergo 200E
structural 200S
Powertrain 200P
Part Files -300
Any item that requires fabrication beyond the item, if cots are modified, tubes bent, parts otherwise edited
Handling 300H
Ergo 300E
Structural 300S
Powertrain 300P
LV 300L
COTS components- 400
Cots Assembly - 400A
Cots part (and multibody) - 400P
Hardware- 500
bolts and fasteners- 501
nuts- 502
clamps- 503
Naming:
Names are to be derived using closest physical description of the item, (then if applicable for distinguishing: size of item, color of item, use of item)
Rev changes:
Rev changes should happen on the parts themselves not car after any change has been made following a cleared for manufacturing part, i.e. if a part has been reviewed, and put into production but an issue was found, a rev B would need to be created.
Parts should be renamed after a rev change, and the drawing for it should follow suit, but the rev A file should be archived as a PDF.
rev changes have to go through the same process as parts to get approved into drawings
Naming Example:
so for a part in the harness assembly on 22 after we found an issue requiring a rework at comp:
300E_HARN_ClothToBoltHarnessTabLarge_revB_22
this change can go along with the deletion of folders within the systems, I.E. lead projects get removed if system folders are populated with this naming scheme and make it easy to browse for files easily without removing the
3D Representations of Electrical Parts
PDM Data Card
info you type in:
description
auto populated:
revision
part number