Aerodynamics

Geometries

Front Wing

All airfoils and endplates are separate parts that will be screwed together.

Rear Wing

All airfoils and endplates are separate parts that will be screwed together.

Materials

Fabric

  • 2x2 twill 3k carbon fiber fabric

Resin https://www.fibreglast.com/product/System_2000_Epoxy_Resin_2000

  • System 2000 Laminating Epoxy Resin

  • 2060 Hardener

Other/Equipment

High-Level Procedure

Molds [2x 2hr active]

All molds will be covered in gelcoat to prevent resin from seeping into the foam during the layup. All front molds will be coated in one session; all rear molds will be coated in the same work session.

The gel coat takes ~45 minutes to cure, as which point the parts can be removed from the ventilated area. The setup and fabrication time should take 1hr for each set, resulting in a maximum work session time of 2hr for the front and 2hr for the rear.

Front Airfoils [4hr active, 1wk passive]

The front airfoils will be laid in one work session. From setup to bagging/cleanup, the layup process should take 3hr for the six airfoils. After the parts are bagged, they must remain in the ventilated area with the vacuum pump on for the pot life of the resin (1hr).

The sealed bag can be moved, and will take 2-7 days to fully cure, pending temperature. For the curing, the parts can be brought back to campus and sit sealed up in the NER bay until fully cured.

Front Endplates [3hr active, 1wk passive]

The front endplates will be laid in one work session. From setup to bagging/cleanup, the layup process should take 2hr for the six plates. After the parts are bagged, they must remain in the ventilated area with the vacuum pump on for the pot life of the resin (1hr).

The sealed bag can be moved, and will take 2-7 days to fully cure, pending temperature. For the curing, the parts can be brought back to campus and sit sealed up in the NER bay until fully cured.

Rear Airfoils [3hr active, 1wk passive]

The rear airfoils will be laid in one work session. From setup to bagging/cleanup, the layup process should take 2hr for the three airfoils. After the parts are bagged, they must remain in the ventilated area with the vacuum pump on for the pot life of the resin (1hr).

The sealed bag can be moved, and will take 2-7 days to fully cure, pending temperature. For the curing, the parts can be brought back to campus and sit sealed up in the NER bay until fully cured.

Rear Endplates [2hr active, 1wk passive]

The rear endplates will be laid in one work session. From setup to bagging/cleanup, the layup process should take 1hr for the two plates. After the parts are bagged, they must remain in the ventilated area with the vacuum pump on for the pot life of the resin (1hr).

The sealed bag can be moved, and will take 2-7 days to fully cure, pending temperature. For the curing, the parts can be brought back to campus and sit sealed up in the NER bay until fully cured.

Bodywork

Geometries

The nosecone consists of two primary panels and a top panel. The sidepod is one piece.

Materials

Fabric

  • 2x2 twill 3k carbon fiber fabric

Resin https://www.fibreglast.com/product/System_2000_Epoxy_Resin_2000

  • System 2000 Laminating Epoxy Resin

  • 2060 Hardener

Other/Equipment

High-Level Procedure

Molds [4 hrs, active]

All molds will be sealed with gelcoat. Setup and fabrication will take ~180 minutes. The gel curing will take ~45 minutes. Fabrication and curing will be in an appropriately ventilated area and the molds may be removed once fully cured.

Nosecone Primary Panels [4 hrs active, 1 week passive]

Both primary panels will be fabricated in one work session. The setup, fabrication, and vacuum bagging time is ~120min for each panel. The part must remain in an appropriated ventilated area while under vacuum for the specified curing time. Once cured, the sealed part may be removed and placed into the NER bay for ~1 week to fully cure.

Nosecone Top Panel [4 hrs active, 1 week passive]

The top panel will be fabricated in one work session. The setup, fabrication, and vacuum bagging time is ~240 minutes. The part must remain in an appropriated ventilated area while under vacuum for the specified curing time. Once cured, the sealed part may be removed and placed into the NER bay for ~1 week to fully cure.

Left Sidepod [3 hrs active, 1 week passive]

The left sidepod will be fabricated in one work session. The setup, fabrication, and vacuum bagging time is ~180 minutes. The part must remain in an appropriated ventilated area while under vacuum for the specified curing time. Once cured, the sealed part may be removed and placed into the NER bay for ~1 week to fully cure.

Right Sidepod [3 hrs active, 1 week passive]

The right sidepod will be fabricated in one work session. The setup, fabrication, and vacuum bagging time is ~180 minutes. The part must remain in an appropriated ventilated area while under vacuum for the specified curing time. Once cured, the sealed part may be removed and placed into the NER bay for ~1 week to fully cure.

Seat